DALKEITH EXTRA CARE FACILITY
NEW BUILD

Dalkeith Extra Care Facility was a new build designed to accommodate 39 beds, encompassing thoughtful infrastructure planning and meticulously landscaped surroundings.

SECTOR: RESDENTIAL/ HEALTHCARE
CLIENT/S: OGILIVIE CONSTRUCTION
LOCATION: EDINBURGH
COMPLETION: 2023

  • Plumbing

  • Consumer Units

  • LTHW Heating – installation of two 200kW gas fired boilers supplemented with a 7.5kW CHP unit.

  • High efficiency LED lighting

  • Small Power

  • Gas fired heating and ventilation, installation of individual MVHR units to each apartment

  • Water Services – installation of an LTHW plate heat exchanger.

  • Fire detection and alarm

  • Heating Controls

  • Cabling and Containment

  • Main LV Distribution

  • Main LV Switchboard

  • Internal and external lighting

 RELATED CASE STUDIES

A hallway with glass door, a railing and ceiling pendant lights

David Stow Building, Glasgow

RESIDENTIAL DEVELOPMENT

Straits Meadows, Edinburgh

RESIDENTIAL DEVELOPMENT

Medical Training Room with beds and scrub-up Troughs

Pathfoot Clinical Spaces - University of Stirling

HEALTHCARE TEACHING FACILITY

Please get in touch if you require further information on our case studies or services.